Saturday 21 March 2009

Painting flint and other progress

Last time I blogged about the pizza I was trying to work out the best way to make it rotate and was ready to try painting the flint wall. I've not thought any more about rotating and I've been putting off the painting. A few weeks ago I had a go at painting and wasn't at all happy with the results. After a third attempt I'm still not happy but since the wall is going to have plants growing up it I may leave it. I've also put some more polystyrene in between the card framework. The theory is that they'll be something under shell of the landscape which should make planting trees easier. I've covered the who lot is masking tape and also slapped some dirty black paint over the track. The bridge now has some retaining walls on the inside of the curve. I'll add some wooden planks to hold up the steeper bits of embankment either side. I've also put the first layer of glue on the pond - but I touched it before it was dry and there is a finger print. I'll know for the next layer.

DSCF2271

DSCF2272

No comments: